Academic Qualifications
PhD Business & Management
Queen Mary University of London
2021 – to date
MS Total Quality Management
Institute of Quality and Technology Management
2014 – 2016
BE Mechanical Engineering
National University of Science and Technology
2009 – 2013
Dissertations
TQM, 5S and Quality tools status: Pakistani manufacturing sector perspective
MS Total Quality Management
The purpose of this study is to find the “status of 5S”, “Quality tools” and “Total quality management” in manufacturing sector of Pakistan and to co-relate them. I was awarded distinction in my dissertation.
Designing and fabrication of bionic leg for handicapped individuals
BE Mechanical Engineering
In this project, a prosthetic limb is being controlled through an electronic circuit taking input from the healthy thigh. The working thigh is moved in certain ways to control the prosthetic device like normal working of leg. The Prosthetic limb is called Hybrid because motor actuation is used for movement of leg, hence it involves both mechanical and electronic aspects of engineering. I was responsible for the designing and fabrication of the mechanical portion of the limb. We have used solid works 2013 version for designing and analysis purposes.
Term Projects
MS Total Quality Management
“Sustainability analysis of Atlas Honda Supply chain’s for the sales and production of one million motorcycles”.
The objective of this project is to propose the strategy to achieve the sustainability of company operations for the sales volume of one million units per year.
Detailed study of Health, Safety and Environment management system in Atlas Honda motorcycle plant. How Honda is implementing the safety measures in order to make ease of work and to avoid accidents in Cutting and Welding departments.
Comparative analysis of ISO 9001:2008 and ISO 9001:2015 along with the implementation of ISO 9001:2015 in production department of Atlas Honda Limited. This project took six months for trainings and manual updating.
Comparative analysis of ISO 14001:2004 and 14001:2015 along with its implementation in Production department.